ATTN Rockledge motorists - please be advised that Roy Wall Boulevard will be closed on Thursday and Friday (May 16-17) and on Monday (May 20) for installation of an air release valve. Here are some specifics from Maxwell Contracting that we hope will prove to be beneficial:
Please be advised that Roy Wall Blvd will be closed at the locations and dates listed below. Roy Wall Blvd will be open in both directions except for where the road work is taking place, where both lanes will be closed.
- Thu, May 16 - 7 am to 4 pm - Roy Wall Blvd closed between Murrell Road to the East side of Whetstone Place. Entrance to Whetstone Place will not be closed.
- Fri, May 17 - 7 am to 4 pm - Roy Wall Blvd closed between the west side of Sunday Drive to the east side of Palace Drive.
- Mon, May 20 - 7 am to 12 pm - Roy Wall Blvd closed between Murrell Road to the east side of Whetstone Place. Entrance to Whetstone Place will not be closed.
- Mon, May 20 - 12 pm to 4 pm - Roy Wall Blvd closed between the west side of Sunday Drive to the east side of Palace Drive.
Thank you for your patience during this time!